Beachfront Gates 1

Beachfront Gates 1

نبذة عن مشروع Beachfront Gates 1

Beachfront Gates 1 by Dubai South is an innovative residential addition to Dubai South. Positioned near the world’s future largest airport, it offers residents a forward-thinking lifestyle with modern design and sustainable living at its core.

الحقائق الرئيسية

  • سعر الإطلاق: 1M
  • التسليم: Q4 2026
  • النوع: Apartments
  • الموقع: Beachfront Gates 1, Beachfront Gates, Residential District, Dubai South, Dubai
  • المنطقة: Dubai South
  • المجتمع: Residential District - Beachfront Gates
  • البرج: Beachfront Gates 1

لماذا الاستثمار في Beachfront Gates 1

  • Strategic Location near Al Maktoum International Airport
  • Proximity to Expo City Dubai
  • Future-Proof Investment in a Rapidly Growing Hub
  • Attractive Starting Prices from 1M

مزايا الموقع Beachfront Gates 1

  • 5 Mins to Al Maktoum International Airport (DWC)
  • 10 Mins to Expo City Dubai
  • Easy Access to Emirates Road & Sheikh MBZ Road
  • Future Metro Extensions planned for the area

نمط الحياة في Beachfront Gates 1

Dubai South is the city's largest single urban master development, designed to support every aspect of human living. It is a 'City of Happiness' focused on quality of life and business connectivity.

إمكانات الاستثمار في ٪٪

With the expansion of Al Maktoum Airport to become the world's largest, Dubai South is projected to see significant capital appreciation and consistent high rental demand over the next decade.

خطة السداد لـ %س

MilestonePercentage
InstallmentsTBA
HandoverQ4 2026

وسائل الراحة في Beachfront Gates 1

  • Shared Fitness Facilities
  • Outdoor Swimming Pool
  • Kids Play Areas
  • Secured Covered Parking

الأماكن القريبة من Beachfront Gates 1

  • Expo City Dubai
  • Al Maktoum International Airport
  • Ibn Battuta Mall (20 mins)
  • Jebel Ali Port

الوحدات المتاحة بالنسبة المئوية

TypePrice Range
Studio - 4BRCheck Latest Availability

الأسئلة الشائعة حول Beachfront Gates 1

  • Is Dubai South Freehold? Yes, it is 100% Freehold for all nationalities.
  • Handover? Expected in Q4 2026.